Wellington mine, 1958 January
Dates
- 1958 January
Conditions Governing Access
Privacy restricted; permission to use materials must be obtained from the Supervisor of Reference Services.
Conditions Governing Use
It is the responsibility of the researcher to obtain any necessary copyright clearances. Permission to publish material from Geneva Steel Holdings Corporation records must be obtained from the Supervisor of Reference Services and/or the L. Tom Perry Special Collections Board of Curators.
Extent
1 photograph : b&w ; 20 x 22 cm
Language of Materials
English
General note
Caption on item: "Wellington," and "Workmen are shown here completing the outside walls of the main building at Columbia - Geneva Steel Division’s new coal cleaning plant near Wellington, Carbon County, Utah. Machinery is now being moved into the 13-story structure which. When put in operation this spring, will wash up to 600 tons of coal per hour. Coal cleaned at the U. S. Steel plant will be shipped to the coke ovens at Geneva Works."
Repository Details
Part of the L. Tom Perry Special Collections Repository
1130 HBLL
Brigham Young University
Provo Utah 84602 United States